Bonneville Power Administration to Improve Transmission Line

Date August 5, 2009 at 5:10 am | Topic: Local News

BPA completed the EA and FONSI and decided to proceed with the project. Activities include removing most of its existing Olympia Shelton No. 1 115-kV transmission line (structures and conductor) from Olympia Substation to Shelton Substation and replacing the last 14.5 miles of this line into Shelton Substation with a double-circuit 230-kV line on lattice steel towers. This will improve voltage stability during winter-peak load conditions on the Olympic Peninsula. The project is expected to be complete in fall 2009. For more information, go to www.efw.bpa.gov/environmental_ ... Document_Library/Olympic/  




This article comes from KBKW News
http://kbkw.com

The URL for this story is:
http://kbkw.com/modules/news/article.php?storyid=753