RSS Feed

Coffee Talk
Weekdays 6-10am
with Doug McDowell
Join Doug McDowell for Coffee Talk every weekday morning from 6 to 10
Click for more


Follow us for Live, Local, Late-Breaking News


Subscribe to KBKWSubscribe to KBKW, and stay informed from your inbox.

Listen to KBKW Live with your Winamp Player
« 1 ... 818 819 820 (821) 822 823 824 ... 884 »

Made Where Now?

Posted by David Haviland on June 16, 2009 at 8:28 am (520 social interactions)

Made in China

Boss Bill notes the source of flag pins handed out recently.

Read More... | 461 bytes more

EOC Meeting Room Closed for Community Use

Posted by David Haviland on June 16, 2009 at 6:00 am (475 social interactions)

South Bend, Washington - Effective July 31, 2009, the Pacific County Emergency Operations Center (EOC) will no longer be utilized as a meeting room.  The Pacific County Emergency Management Agency (PCEMA) intends to keep the EOC ready for activation 24/7 in the event of an emergency.

Read More... | 911 bytes more

WSDOT collects pavement samples in Aberdeen and Hoquiam

Posted by David Haviland on June 16, 2009 at 4:52 am (743 social interactions)

GRAYS HARBOR - Aberdeen and Hoquiam drivers may see temporary delays along streets in the two cities on Tuesday, June 16 between 8 a.m. and 5 p.m. WSDOT crews will be taking core samples along city streets to test their structural integrity.

The work is part of WSDOT's planning for a new pontoon construction site to build pontoons for the SR 520 floating bridge. Construction of the site will begin in 2010. The pontoon construction work will bring heavy truck traffic to some streets in the area.

WSDOT is currently evaluating two candidate sites to build a new pontoon construction facility in Grays Harbor - one in Hoquiam and one in Aberdeen. 

Read More... | 2676 bytes more

Grays Harbor County Road Construction Overview

Posted by David Haviland on June 15, 2009 at 6:16 am (1344 social interactions)

CONSTRUCTION

US 101, West Fork Hoquiam River Bridge
Neal Uhlmeyer, Project Engineer, 360-533-9352
www.wsdot.wa.gov/projects/us101/forkhoquiamriverbridge/
This $3.6 million project replaces two aging bridges that cross the West Fork Hoquiam River, mileposts 98.13 and 99.5. The project is scheduled for completion in summer 2009.
DAYS: Monday - Friday
TIME: 7 a.m. to 5:30 p.m.
DESCRIPTION: Bridge replacement. Southbound lane closure from mileposts 98.07 to 98.2 and from mileposts 99.4 to 99.6.
LOCATION: Both directions of US 101, Hoquiam River Bridge, mileposts 98 to 99.
EXPECT: Long-term lane closure and signal-controlled, alternating one-way traffic at both locations, 24 hours a day until further notice.

Read More... | 6991 bytes more

Mason County Road Construction Overview

Posted by David Haviland on June 15, 2009 at 6:00 am (812 social interactions)

CONSTRUCTION

SR 3, Jct. US 101 to Mill Creek Bridge - Safety
Jeff Cook, Project Engineer, 360-412-3420
This safety improvement project provides new centerline rumble strips, upgraded guardrail, new signs and new roadway striping on a portion of SR 3 south of Shelton.
DAYS:
Monday - Friday
TIME: 7 p.m. to 6 a.m.
DESCRIPTION: Guardrail removal and replacement. Roadway striping.
LOCATION:
Both directions of SR 3, from US 101 to Mill Creek Bridge near Shelton, mileposts 0.00 to 0.97.
EXPECT: One-way, alternating traffic.

Read More... | 3428 bytes more
« 1 ... 818 819 820 (821) 822 823 824 ... 884 »
Listen to KBKW Live with your Winamp Player

The Simple Dollar